by Lotus54 » Mon May 08, 2023 5:58 pm
New front/rear tyres, tubes rim strips. New front brake shoes, adjusted and feels good. I did not arc the shoes in, I figured I would just ride it a little then see how they are seating.
Also new O-ring chain and one wheel bearing (rest were very good).
I will go for the electrics next, waiting on a new handlebar light/turnsignal switch setup and a 2-position keyswitch. Originally, these had the keyswitch connect the negative to the battery and earth it. I won’t have a battery, so the keyswitch will just be a ‘kill’ switch, disabling the ignition when turned off. Then I need to run new wires for the turn signals and connect all the new ignition/charging system wiring.
Oh yeah, I have not done the carbs yet. Soon
Getting pretty close!
(Of course, I should be spending more time cleaning up the shop)
- Attachments
-
- IMG_7035.jpeg (312.57 KiB) Viewed 33891 times
1976 OSSA Super Pioneer- 78 Benelli 750 sei,72 250 2C Benelli, 68 Benelli Dynamo trail, 76 OSSA GPII Phantom, Beta XTrainer 300, Lotus Elan S3