I finally made some progress on the Vinnie yesterday. Figured I'd better do it before my eye surgery.
It's not a difficult job but very time consuming since the end result is .001 clearance across the surface of the bearing journal.
Next will be setting up the side clearance for the rods then pressing the other flywheel in place and zeroing in the main bearing journals. Next will be fitting the crank into the engine cases to check for making the rods central in their bores.
This is done by shimming or grinding on the drive side main shaft bearings. The timing side rides on cylindrical bearings.